Page 17 of 112 FirstFirst ... 715161718192767 ... LastLast
Results 161 to 170 of 1120

Thread: Indoor Practice Facility

  1. #161
    Join Date
    Sep 2003
    Location
    Fargo
    Posts
    15,818

    Default Re: Indoor Practice Facility

    Hmmm! Look what I found on the NDSU site. Under construction this summer?

    https://www.ndsu.edu/fileadmin/facil...s_Projects.pdf

    533 In a row

  2. #162
    Join Date
    Sep 2004
    Posts
    29,661

    Default Re: Indoor Practice Facility

    Quote Originally Posted by roadwarrior View Post
    Hmmm! Look what I found on the NDSU site. Under construction this summer?

    https://www.ndsu.edu/fileadmin/facil...s_Projects.pdf
    Interesting. That would be crazy fast. I dont think Gene Taylor was able to raise that much for the SHAC in 7 years. I wonder If they at the very minimum have enough for the basic stripped down version and anticipate having the full bells and whistle version soon? Or could it just be a misprint?
    .


    17X National Champions: 65, 68, 69, 83, 85, 86, 88, 90, 11, 12, 13, 14, 15, 17, 18, 19, 21

    Join the Green and the Gold Collective to take Bison football to the next level. Starts at $10 a month

    The Green and The Gold Collective is excited to announce our #DriveToFive membership campaign. The goal of this campaign is to get to 500 monthly members. Reaching this goal will help us provide financial support to NDSU student athletes, including every returning member of the football team that saw action on the field last year!

    https://thegreenandthegold.com

  3. #163
    Join Date
    Jan 2007
    Posts
    6,020

    Default Re: Indoor Practice Facility

    Quote Originally Posted by roadwarrior View Post
    Hmmm! Look what I found on the NDSU site. Under construction this summer?

    https://www.ndsu.edu/fileadmin/facil...s_Projects.pdf
    Interesting. I just sent in a check and a pledge form to Matt Lien last week and he told me they are still raising money and nothing starts until the spring of 2020. I sure hope I can trust the guy I gave my money too.

    I'm guessing they got approval to start whenever they want, but the money isn't all in hand.

    FBS OR BUST FIRE LARSEN
    Hey UND: 34-9...38-7...34-13...16-6...42-21


    100% anti MAGA

  4. #164
    Join Date
    Sep 2005
    Location
    Oak Ridge, NC
    Posts
    8,088

    Default Re: Indoor Practice Facility

    Maybe some initial site prep work to get things moving?
    Get your BB tickets now!!!

  5. #165
    Join Date
    Sep 2007
    Location
    Quahog, RI
    Posts
    18,970

    Default Re: Indoor Practice Facility

    Lots of underground infastructure, grade, ect, needs to be done before Building starts.
    NDSU Athletics: oderint dum metuant


  6. #166
    Join Date
    Mar 2014
    Location
    Colorado Springs, CO
    Posts
    10,744

    Default Re: Indoor Practice Facility

    Quote Originally Posted by Gully View Post
    Maybe some initial site prep work to get things moving?
    Hard to tell as the End Date is listed as August 3, 2020. I'm not a construction guy, but is getting one of these done in about a year normal?
    Hail the BISON!!!

  7. #167
    Join Date
    Feb 2006
    Posts
    5,907

    Default Re: Indoor Practice Facility

    Quote Originally Posted by roadwarrior View Post
    Hmmm! Look what I found on the NDSU site. Under construction this summer?

    https://www.ndsu.edu/fileadmin/facil...s_Projects.pdf
    Just realized the Softball Indoor Practice facility is not on the list. Maybe it did not get legislative approval..

  8. #168
    Join Date
    Sep 2003
    Location
    Fargo
    Posts
    15,818

    Default Re: Indoor Practice Facility

    Quote Originally Posted by imabison View Post
    Just realized the Softball Indoor Practice facility is not on the list. Maybe it did not get legislative approval..
    I think it's more the case that the priority dropped.

    533 In a row

  9. #169
    Join Date
    Apr 2007
    Location
    Hillsboro, ND
    Posts
    10,158

    Default Re: Indoor Practice Facility

    This is a somewhat internal NDSU facilities management file? My guess is the 8/1 start date is a "schedule" date for when the assigned person is going to have to start looking at bids etc? Or as mentioned it could be start of site work as well but I'd think that wouldn't happen until after NDSU gets to the point where outdoor practices are less than ideal (Nov??) and can move to the bubble or Fargodome if available. Ideally though you'd start sitework before the ground freezes too hard and also so you can get foundations (with ground thaw methods) in over the winter and start of structural framing very late winter or very early spring. That way you could almost have a good portion done (or say the practice field) by the following fall/early winter.

  10. #170
    Join Date
    Sep 2004
    Posts
    29,661

    Default Re: Indoor Practice Facility

    Been kind of quiet late lately. Roughly 9 months ago it was reported we were half way there. Curious how the fundraising is going
    .


    17X National Champions: 65, 68, 69, 83, 85, 86, 88, 90, 11, 12, 13, 14, 15, 17, 18, 19, 21

    Join the Green and the Gold Collective to take Bison football to the next level. Starts at $10 a month

    The Green and The Gold Collective is excited to announce our #DriveToFive membership campaign. The goal of this campaign is to get to 500 monthly members. Reaching this goal will help us provide financial support to NDSU student athletes, including every returning member of the football team that saw action on the field last year!

    https://thegreenandthegold.com

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •