    Default Re: 19 th Ave construction

    I've seen the contractor doing the 25th street south project working both at night and weekends.

  2. #52
    Join Date
    Feb 2008
    Location
    your mom
    Posts
    7,552

    Default Re: 19 th Ave construction

    Quote Originally Posted by 1998braves64 View Post
    Pretty sure that getting the concrete and even asphalt wouldn't be insurmountable because when they pour the concrete on the elevator silos those go 24hrs as they can't stop once they start. Asphalt might be a different story but Piepkorn only wanted it on main access roads such as 19th and all of these are concrete as far as I know.
    We won a national paving award paving at night ...... Right there in Hillsboro ...... Another note..... Master just does not care about deadlines ..... And has anyone driven on what they have done rides like a gravel road

  3. #53
    Join Date
    Apr 2007
    Location
    Hillsboro, ND
    Posts
    10,161

    Default Re: 19 th Ave construction

    Quote Originally Posted by unbison View Post
    We won a national paving award paving at night ...... Right there in Hillsboro ...... Another note..... Master just does not care about deadlines ..... And has anyone driven on what they have done rides like a gravel road

    No wonder they are so cruddy!

  4. #54
    Join Date
    Feb 2006
    Posts
    5,913

    Default Re: 19 th Ave construction

    Quote Originally Posted by unbison View Post
    We won a national paving award paving at night ...... Right there in Hillsboro ...... Another note..... Master just does not care about deadlines ..... And has anyone driven on what they have done rides like a gravel road
    Did they do the 2nd street underpass?? It was declared rough when it was finished...
    Nothing in the online paper about Peipkorn and Master today.

  5. #55
    Join Date
    Feb 2006
    Posts
    5,913

    Default Re: 19 th Ave construction

    37 days, not sure if that is from the date in Sept , or from now. The panel decided that weather was not an option, blaming it on utilities, well what about poor panning.

  6. #56
    Join Date
    Sep 2007
    Location
    West Fargo
    Posts
    10,889

    Default Re: 19 th Ave construction

    Went to subway at 1215 today I was the only vehicle in the drive through. Masters construction, bad for business, good for a quick lunch

  7. #57
    Join Date
    Feb 2008
    Location
    your mom
    Posts
    7,552

    Default Re: 19 th Ave construction

    Quote Originally Posted by imabison View Post
    37 days, not sure if that is from the date in Sept , or from now. The panel decided that weather was not an option, blaming it on utilities, well what about poor panning.
    You mean to tell me century links personal contractor didn't know what utilities were there..... That said we waited a month in oxbow for phone lines to be moved

  8. #58
    Join Date
    Feb 2006
    Posts
    5,913

    Default Re: 19 th Ave construction

    Quote Originally Posted by unbison View Post
    You mean to tell me century links personal contractor didn't know what utilities were there..... That said we waited a month in oxbow for phone lines to be moved
    All KFGO said was "utilities" no mention of who....grrr...

  9. #59
    Join Date
    Feb 2006
    Posts
    5,913

    Default Re: 19 th Ave construction

    Quote Originally Posted by imabison View Post
    All KFGO said was "utilities" no mention of who....grrr...
    http://www.inforum.com/content/fargo...avenue-project

    Houston Engineering recommended 37 days. Master asked for 31.5. It is from the original finish date of Sept 15.
    My question is how much are the delays costing, and who is paying if the Master gets no penalty....

  10. #60
    Join Date
    Sep 2004
    Posts
    29,709

    Default Re: 19 th Ave construction

    Quote Originally Posted by imabison View Post
    37 days, not sure if that is from the date in Sept , or from now. The panel decided that weather was not an option, blaming it on utilities, well what about poor panning.
    Agreed . Planning like a pro can prevent stuff and they didn't work at night so they obviously didn't show any urgency. Me thinks they working the system starting with the lowest bid since they know the city has to give it to them, even if they lack the manpower
    .


    17X National Champions: 65, 68, 69, 83, 85, 86, 88, 90, 11, 12, 13, 14, 15, 17, 18, 19, 21

    Join the Green and the Gold Collective to take Bison football to the next level. Starts at $10 a month

    The Green and The Gold Collective is excited to announce our #DriveToFive membership campaign. The goal of this campaign is to get to 500 monthly members. Reaching this goal will help us provide financial support to NDSU student athletes, including every returning member of the football team that saw action on the field last year!

    https://thegreenandthegold.com

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •