    It appears that the 19th Ave from 10 th to University appears and I say that lightly to be to the point that it could be mostly open by
    Friday or sooner. This does not include the 1 lane on the west side of 10th st that is going to be closed. Who knows how long that
    will take. It looked like they might be pouring on the University to Albrecht side, but there was a truck beside me so all I saw was the
    truck and big concrete machine.

    We are getting very very sick of this project.....

  2. #32
    Join Date
    Nov 2008
    Location
    Eating cake
    Posts
    13,470

    Default Re: 19 th Ave construction

    Any idea who did the 1st Ave N bridge this summer? The EB lanes went fast, a week or three, seemed smooth. The WB lanes took like 6 weeks I bet...looked like they poured concrete at least twice and had to hammer it up once. Looked like they were done for about two weeks but the trucks stayed there, that was super annoying.

    Also, there is a lift station in Moorhead by my house that they have dug up and filled in a minimum of three times. My street has been closed for the better part of a month already for something that isn't even on the street...

    I hate construction season.
    check neg rep

    Warning: It is the offseason. Trollolol may or may not be in full swing. Take a deep breath and eat a trolli burger before reading my posts.

    Quote Originally Posted by RowdyRabbit View Post
    I'm tired of seeing the old Belushi clip from Animal House..."over? it's not over..." in the waning seconds of another loss to NDSU.

  3. #33
    Join Date
    Sep 2007
    Location
    West Fargo
    Posts
    10,889

    Default Re: 19 th Ave construction

    Quote Originally Posted by imabison View Post
    It appears that the 19th Ave from 10 th to University appears and I say that lightly to be to the point that it could be mostly open by
    Friday or sooner. This does not include the 1 lane on the west side of 10th st that is going to be closed. Who knows how long that
    will take. It looked like they might be pouring on the University to Albrecht side, but there was a truck beside me so all I saw was the
    truck and big concrete machine.

    We are getting very very sick of this project.....
    They poured one lane yesterday all the way. Yaaaaaaaa Hopefully can get to the rest. Getting out of the lot on Saturday was the worst I have ever dealt with after any event I have been to in the dome.

  4. #34
    Join Date
    Feb 2006
    Posts
    5,913

    Default Re: 19 th Ave construction

    Quote Originally Posted by Bison"FANatic" View Post
    They poured one lane yesterday all the way. Yaaaaaaaa Hopefully can get to the rest. Getting out of the lot on Saturday was the worst I have ever dealt with after any event I have been to in the dome.
    I agree, I was in it, the Incarnate Word game was not a good example for me, I am back to either walking, or parking in the CVS lot, it has to be better.

  5. #35
    Join Date
    Sep 2007
    Location
    West Fargo
    Posts
    10,889

    Default Re: 19 th Ave construction

    Quote Originally Posted by imabison View Post
    I agree, I was in it, the Incarnate Word game was not a good example for me, I am back to either walking, or parking in the CVS lot, it has to be better.
    It was just starting to rain otherwise I would have done the same thing but didn't want to make my wife walk in the rain.

  6. #36
    Join Date
    Feb 2006
    Posts
    5,913

    Default Re: 19 th Ave construction

    Quote Originally Posted by imabison View Post
    It appears that the 19th Ave from 10 th to University appears and I say that lightly to be to the point that it could be mostly open by
    Friday or sooner. This does not include the 1 lane on the west side of 10th st that is going to be closed. Who knows how long that
    will take. It looked like they might be pouring on the University to Albrecht side, but there was a truck beside me so all I saw was the
    truck and big concrete machine.

    We are getting very very sick of this project.....
    Wow, it appears that Master got a swift kick, they got alot of the lane removed from left lane of 10th, poured alot of university to Albrecht.
    1 lane both ways on 19th 10th to university ,but the question is are they replacing all of the interaction at university??

  7. #37
    Join Date
    Feb 2006
    Posts
    5,913

    Default Re: 19 th Ave construction

    Pretty disappointed they did not work on Sat.

  8. #38
    Join Date
    Sep 2007
    Location
    Quahog, RI
    Posts
    18,973

    Default Re: 19 th Ave construction

    Quote Originally Posted by imabison View Post
    Pretty disappointed they did not work on Sat.
    They worked hard all year.....needed a break on a nice fall day



    NDSU Athletics: oderint dum metuant


  9. #39
    Join Date
    Sep 2003
    Location
    Fargo
    Posts
    15,826

    Default Re: 19 th Ave construction

    Quote Originally Posted by imabison View Post
    Pretty disappointed they did not work on Sat.
    And give up a day at the lakes? They are hoping for more rain so they can ask for another delay OK from the city.

    533 In a row

  10. #40
    Join Date
    Feb 2008
    Location
    your mom
    Posts
    7,553

    Default Re: 19 th Ave construction

    Quote Originally Posted by tjbison View Post
    They worked hard all year.....needed a break on a nice fall day



    They work Saturdays news to me