-
NDSU STEM building
Construction will soon start on this new classroom/laboratory building. It will be located immediately east of the student union and it will have three floors plus a basement. The basement level will be connected to the student union. Construction bids were right on target with the estimates (about $28,000,000) and they were able to add several optional features to the building. Roers Construction will be the general contractor. The first use of the building will be in spring semester 2016.
533 In a row
Posting Permissions
- You may not post new threads
- You may not post replies
- You may not post attachments
- You may not edit your posts
-
Forum Rules