Page 1 of 4 123 ... LastLast
Results 1 to 10 of 33

Thread: 18 Million Dollar Development Downtown

  1. #1
    duluthbison's Avatar
    duluthbison is offline Senior Member Gets their mail at the West Parking Lot
    Join Date
    Sep 2008
    Location
    Duluth, MN
    Posts
    1,813

    Default 18 Million Dollar Development Downtown

    Just announced today, the site of the former Lark Theatre and Cinema Grill which have been demolished will be made into a 18 million dollar complex with the top 4 floors as housing for NDSU Students.

    http://www.in-forum.com/articles/ind...TOKEN=93994722
    North Dakota State Bison | 16 Time National Champions:
    1965, 1968, 1969, 1983, 1985, 1986, 1988, 1990, 2011, 2012, 2013, 2014, 2015, 2017, 2018, 2019

    Proud NDSU Alumnus | Class of 2011


  2. #2
    Join Date
    Sep 2003
    Location
    Fargo
    Posts
    15,826

    Default Re: 18 Million Dollar Development Downtown

    Construction has been going on for over a month already. The building will be a huge change for that block.

    533 In a row

  3. #3
    duluthbison's Avatar
    duluthbison is offline Senior Member Gets their mail at the West Parking Lot
    Join Date
    Sep 2008
    Location
    Duluth, MN
    Posts
    1,813

    Default Re: 18 Million Dollar Development Downtown

    Quote Originally Posted by roadwarrior View Post
    Construction has been going on for over a month already. The building will be a huge change for that block.
    Ya I've noticed but have always wondered what will be going in its place. But between the Niskanen addition and the Downtown development, NDSU shouldn't have to worry about housing for some time.
    North Dakota State Bison | 16 Time National Champions:
    1965, 1968, 1969, 1983, 1985, 1986, 1988, 1990, 2011, 2012, 2013, 2014, 2015, 2017, 2018, 2019

    Proud NDSU Alumnus | Class of 2011


  4. #4
    Join Date
    Oct 2007
    Location
    Garrison, ND
    Posts
    999

    Default Re: 18 Million Dollar Development Downtown

    Quote Originally Posted by ndsustudent89 View Post
    Ya I've noticed but have always wondered what will be going in its place. But between the Niskanen addition and the Downtown development, NDSU shouldn't have to worry about housing for some time.
    I'm pretty sure somebody made a statement like that when they built the last high rise and used to have the Graver in downtown. How'd that turn out?
    "We will choke their ass out, we will get our victory and we will sing the Rouser."

    -Tim Brewster 10/20/2007 about 10:00am (BTN)

    THE "90BISON" - In case there is ANY confusion.......

  5. #5
    Join Date
    Aug 2007
    Location
    Flavortown!
    Posts
    15,509

    Default Re: 18 Million Dollar Development Downtown

    So does this mean they will actually have to take down that sign that read "Coming in Fall 2005 - Cityscape Center"?

  6. #6
    duluthbison's Avatar
    duluthbison is offline Senior Member Gets their mail at the West Parking Lot
    Join Date
    Sep 2008
    Location
    Duluth, MN
    Posts
    1,813

    Default Re: 18 Million Dollar Development Downtown

    Quote Originally Posted by 90BISON View Post
    I'm pretty sure somebody made a statement like that when they built the last high rise and used to have the Graver in downtown. How'd that turn out?
    Good point, but that was 20 years ago and 5,000 less students. I think that this will solve the current housing problem but they need more room so they aren't always scrambling to find beds for freshman. If Chapman gets his way and has 16,000+ here by time I graduate in 2012 (*i think) we are going to need many more academic buildings and more dorms. Besides, with the new developments combined, doesn't NDSU have roughly room for 950 more students?
    North Dakota State Bison | 16 Time National Champions:
    1965, 1968, 1969, 1983, 1985, 1986, 1988, 1990, 2011, 2012, 2013, 2014, 2015, 2017, 2018, 2019

    Proud NDSU Alumnus | Class of 2011


  7. #7
    Join Date
    Sep 2003
    Location
    Fargo
    Posts
    15,826

    Default Re: 18 Million Dollar Development Downtown

    Quote Originally Posted by bisonmike2 View Post
    So does this mean they will actually have to take down that sign that read "Coming in Fall 2005 - Cityscape Center"?
    Actually, I think that sign bit the dust already!

    533 In a row

  8. #8
    Join Date
    Oct 2007
    Location
    Garrison, ND
    Posts
    999

    Default Re: 18 Million Dollar Development Downtown

    Quote Originally Posted by ndsustudent89 View Post
    Good point, but that was 20 years ago and 5,000 less students. I think that this will solve the current housing problem but they need more room so they aren't always scrambling to find beds for freshman. If Chapman gets his way and has 16,000+ here by time I graduate in 2012 (*i think) we are going to need many more academic buildings and more dorms. Besides, with the new developments combined, doesn't NDSU have roughly room for 950 more students?
    You just made my point. As long as NDSU plans to keep growing, the building and expansion can never stop. If you're adding 500 new students every year, that in itself is a new dormitory every year.
    "We will choke their ass out, we will get our victory and we will sing the Rouser."

    -Tim Brewster 10/20/2007 about 10:00am (BTN)

    THE "90BISON" - In case there is ANY confusion.......

  9. #9
    Join Date
    Jun 2006
    Location
    Wahpeton
    Posts
    14,211

    Default Re: 18 Million Dollar Development Downtown

    By the time the two projects open up, they will be near capacity. This year, over 400 students were placed in hotels, and 260 were still living there in mid-October. The 220 student Cityscapes project won't even cover the October number and the 800 student Niskanen project won't be ready until fall 2010. If freshmen and grad student growth is anything close to what it was this year, NDSU will be putting students back in hotels by 2011 or 2012. It won't be too long before every residence hall in the campus proper will be freshmen-only, save Bison Court.

    As for the Cityscapes project, I can't say I'm thrilled with the look of the design. I hope it will be one of those designs that looks better built than on paper. The ground floor retail could rock if they get the right businesses. This could be the first location downtown where a grocery store could actually work as long as Cityscapes doesn't charge a ridiculous amount for rent. From the drawings, it even looks like they may have left enough sidewalk room to allow for bistro seating during the warmer months.

    Overall, I still can't believe how fast the Downtown campus has grown. At this point, I wouldn't be surprised if it doubles in size again within 10 years. I'm also beginning to think that another academic college is more than a pipe dream. A question for those of you with engineering or architecture degrees: In other universities, is architecture paired up more frequently with engineering or the arts? I've heard of universities with art and architecture schools/colleges and I was wondering which pairing was more prevalent and why.

  10. #10
    Join Date
    Jun 2002
    Location
    NYC and Bucks County, PA
    Posts
    24,828

    Default Re: 18 Million Dollar Development Downtown

    Hehe, Hammersmith - sidewalk seating would be a very interesting development. What next? A piazza with a fountain in summer and skating rink in winter?

    Anyway, sure hope that they get a grocery store downtown - I mean, you just can't have residential city center without a grocery store.

    And did anybody else see the story on the $540,000 2000 sq ft penthouse downtown? I got a kick out of that - the 4th floor isn't exactly what I think of when it comes to penthouses... now kick that law firm out of the top of the Radisson and do it up Austin Powers style and that'd be a penthouse!

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •