Half from Dome surplus
Half from NDSU and naming rights
Anyone got a spare $15,700,000 they're willing to donate and become a god amongst the NDSU community??
Story at: http://www.in-forum.com/articles/ind...83a3eb67413127
Half from Dome surplus
Half from NDSU and naming rights
Anyone got a spare $15,700,000 they're willing to donate and become a god amongst the NDSU community??
Story at: http://www.in-forum.com/articles/ind...83a3eb67413127
"Jfufhr dhuis msdjdi asdj."
- Lou Holtz
Just for the record, I REALLY hope this thing will be expandable to at least 8,000. They didn't even talk about the low capacity issue in the article, which has me worried.
"Jfufhr dhuis msdjdi asdj."
- Lou Holtz
I don't know what the arena at Tennesse Tech holds but it looked very empty last night. 6000 may be ok for size. Always good to have room to expand though.
If God didn’t want us to eat animals, why did he make them out of meat?
It sounds like there will be a marketing report presented in February....hopefully this thing doesn't drag out much longer than that. It mentions needing 36 months for design and construction. Does that include any of the time they're been using for preliminary design already? If not, it's going to be a long wait.
I'm not an E&A guy but I know we have some on here...does 36 months sound right for a building like this? I wonder why they didn't say 3 years....that sounds worse.
Get your BB tickets now!!!
From what I have heard, the ability to expand the number of seats later is designed into the building, without major changes to the structure.
533 In a row
Hey if they can make it expandable to 8,000 then thats great. 6,000 is good for us now but in 10 years(or much sooner) we will need it bigger. Think Fargodome here, that was built in 93 or 94, I think we all wish they would of designed that so it could be expanded to 22,000 or more.
- Revised dome addition plans expected to be finished late Dec/early Jan
- Market assessment to be finished in late Feb/early March (will give tangible data showing this area needs this type of facility)
- Presentation to Dome Authority in March for a vote
- Presentation to City Commission in April for a vote
All the funding (corporate/NDSU) will need to be in place before the votes will go through. If the city is only on the hook for $15 million, I think it will pass. That is a small investment for an additional quality multi-purpose facility.