Re: 19 th Ave construction
I've seen the contractor doing the 25th street south project working both at night and weekends.
Re: 19 th Ave construction
Quote:
Originally Posted by
1998braves64
Pretty sure that getting the concrete and even asphalt wouldn't be insurmountable because when they pour the concrete on the elevator silos those go 24hrs as they can't stop once they start. Asphalt might be a different story but Piepkorn only wanted it on main access roads such as 19th and all of these are concrete as far as I know.
We won a national paving award paving at night ...... Right there in Hillsboro ...... Another note..... Master just does not care about deadlines ..... And has anyone driven on what they have done rides like a gravel road
Re: 19 th Ave construction
Quote:
Originally Posted by
unbison
We won a national paving award paving at night ...... Right there in Hillsboro ...... Another note..... Master just does not care about deadlines ..... And has anyone driven on what they have done rides like a gravel road
No wonder they are so cruddy! :biggrin:
Re: 19 th Ave construction
Quote:
Originally Posted by
unbison
We won a national paving award paving at night ...... Right there in Hillsboro ...... Another note..... Master just does not care about deadlines ..... And has anyone driven on what they have done rides like a gravel road
Did they do the 2nd street underpass?? It was declared rough when it was finished...
Nothing in the online paper about Peipkorn and Master today.
Re: 19 th Ave construction
37 days, not sure if that is from the date in Sept , or from now. The panel decided that weather was not an option, blaming it on utilities, well what about poor panning.
Re: 19 th Ave construction
Went to subway at 1215 today I was the only vehicle in the drive through. Masters construction, bad for business, good for a quick lunch
Re: 19 th Ave construction
Quote:
Originally Posted by
imabison
37 days, not sure if that is from the date in Sept , or from now. The panel decided that weather was not an option, blaming it on utilities, well what about poor panning.
You mean to tell me century links personal contractor didn't know what utilities were there..... That said we waited a month in oxbow for phone lines to be moved
Re: 19 th Ave construction
Quote:
Originally Posted by
unbison
You mean to tell me century links personal contractor didn't know what utilities were there..... That said we waited a month in oxbow for phone lines to be moved
All KFGO said was "utilities" no mention of who....grrr...
Re: 19 th Ave construction
Quote:
Originally Posted by
imabison
All KFGO said was "utilities" no mention of who....grrr...
http://www.inforum.com/content/fargo...avenue-project
Houston Engineering recommended 37 days. Master asked for 31.5. It is from the original finish date of Sept 15.
My question is how much are the delays costing, and who is paying if the Master gets no penalty....
Re: 19 th Ave construction
Quote:
Originally Posted by
imabison
37 days, not sure if that is from the date in Sept , or from now. The panel decided that weather was not an option, blaming it on utilities, well what about poor panning.
Agreed . Planning like a pro can prevent stuff and they didn't work at night so they obviously didn't show any urgency. Me thinks they working the system starting with the lowest bid since they know the city has to give it to them, even if they lack the manpower