Interesting. Most/all of the existing concessions go away to improve concourse traffic flow. Concessions get moved out to expansions. Current west entrance becomes strictly concourse, and a new SW entrance is built.
Printable View
Interesting. Most/all of the existing concessions go away to improve concourse traffic flow. Concessions get moved out to expansions. Current west entrance becomes strictly concourse, and a new SW entrance is built.
Will they get rid of the pretzels?
#notpurple
Suites or club seating is pretty much a must, when it comes to premium seating the dome is living in the stonage as far stadium design is concerned.
Looks like all existing entry/exits are removed and replaced by the two on southwest and southeast corners. All that space is then used for expanding concourse. Westside lobby looks to be opened up and part of concourse?
https://radiocms-images.us1.eldarion...S_UPDATE_2.PNG
https://radiocms-images.us1.eldarion...IGHT_WAY_1.PNG
This reminds me of the SHAC. Includes many of the improvements needed on paper but the overall result is hackneyed. And I don't see any new suites or club area in those renderings, those are probably the most important things they need from a revenue standpoint.
The hotel part looks interesting. Thoughts?
Can that South side be extended (east to west) and widen to add more seating... or like a plaza up top to look over the stadium??
that would be bad ass and could get the dome up to 25,000 which would be perfect.