View Full Version : Memorial Union Construction Webcam
GCWaters
08-09-2005, 02:37 PM
Watch it live, folks....
http://facilities-mgmt.ndsu.nodak.edu/maint_const/
Green-N-Gold
08-09-2005, 04:18 PM
I was a student when they did the last renovation ('88?) which removed the main walkway from going through the game room! Good times...
roadwarrior
08-09-2005, 05:59 PM
I was a student when they built the existing covered entrance on the west side (which will be replaced in this project). Damn am i old!
sambini
08-10-2005, 12:58 AM
Who got the general contract for the project?
Flintstone
08-10-2005, 01:28 PM
Meinecke Johnson of Fargo.
sambini
08-11-2005, 03:05 AM
Good to see they could have a local contractor. Also fine supporters of NDSU Athletics.
sambini
08-13-2005, 02:56 PM
When will this project be done?
tophatfan
08-13-2005, 06:39 PM
I think everything will be done Spring of 07
WYOBISONMAN
08-15-2005, 01:58 PM
I was a student before ANY of those improvements!!
Powered by vBulletin® Version 4.2.1 Copyright © 2024 vBulletin Solutions, Inc. All rights reserved.